ZipWall® Tip for Working with a Multi-Level Ceiling Dec 2019

Tip for Working with a Multi-Level Ceiling – Set up one ZipWall® pole at the edge of a ceiling level, and an adjacent pole at the start of the next level. First, lock the barrier material onto both poles, spacing them to accommodate the level change. Keep the second pole hanging loose while setting up the first pole, then set up the second pole.